Abu‐Hijleh, S F and Ibbs, C W (1989) Schedule‐Based Construction Incentives. Journal of Construction Engineering and Management, 115(03), 430–43.

Davis, K, Ledbetter, W B and Burati, J L (1989) Measuring Design and Construction Quality Costs. Journal of Construction Engineering and Management, 115(03), 385–400.

Eldin, N N (1989) Measurement of Work Progress: Quantitative Technique. Journal of Construction Engineering and Management, 115(03), 462–74.

  • Type: Journal Article
  • Keywords: Project management; Computer applications; Contract management; Measurement; Construction management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1989)115:3(462)
  • Abstract:
    In this paper a procedure is presented which provides a method to quantify work progress on construction projects. The procedure employs two management concepts, the work breakdown structure and the earned value. Although the theoretical basis for the proposed procedure is not new to the industry, it provides professional construction managers and project managers with a practical implementation of these concepts. The procedure is also an excellent computer application in construction management that requires only minimum programming skills. Examples of the input data file and output reports from an actual project are provided for numerical illustration.

Hughes, P J, O'Connor, J T and Traver, A E (1989) Pipe Manipulator Enhancements for Increased Automation. Journal of Construction Engineering and Management, 115(03), 412–23.

Ioannou, P G (1989) Evaluation of Subsurface Exploration Programs. Journal of Construction Engineering and Management, 115(03), 339–56.

Johnston, D W, Kahn, K P and Phillips, J B (1989) Formwork Pressures in Tall and Thick Concrete Walls. Journal of Construction Engineering and Management, 115(03), 444–61.

Reda, R and Carr, R I (1989) Time‐Cost Trade‐Off Among Related Activities. Journal of Construction Engineering and Management, 115(03), 475–86.

Rutherford, A W (1989) Organizational Evolution I‐595 Port Everglades Expressway. Journal of Construction Engineering and Management, 115(03), 357–69.

Shanmuganayagam, V (1989) Current Float Techniques for Resources Scheduling. Journal of Construction Engineering and Management, 115(03), 401–11.

Thomas, H R, Sanvido, V E and Sanders, S R (1989) Impact of Material Management on Productivity—A Case Study. Journal of Construction Engineering and Management, 115(03), 370–84.